Out of date boilers at both Tempe High School and McClintock High School needed to be replaced. The Dynaforce series was used on the Mechanical loop and the TH series (with integral storage tank) was used on the plumbing side. The replacement resulted in 40%-60% reduction of natural gas usage during the first year.

PARTNERS

This project was completed through working with Tempe Mechanical.

 

 

The Tempe Union High School District project was completed using the following materials:

Dynaforce Series Boilers (Camus Hydronics)
(1) 1,400,000 BTUh
(1) 1,200,000 BTUh
(4) 600,000 BTUh
(1) 300,000 BTUh
TH Series Water Heaters (Camus Hydronics)
(1) 150,000 BTUh
(4) 199,000 BTUh
Expansion Tanks & Chemical Pot Feeders (Wessels)
Recirc Pumps (Wilo)